CS028

Total Flow CS028

Field case study

The tubing extends below the bottom perforation interval, so conventional production logging cannot evaluate the full picture.

Cascade flow modelling and Chorus acoustic sensing enabled an accurate multiphase flow profile — including behind casing and below the survey interval.

Outcomes

  • Located and quantified production from all current reservoir zones
  • Evaluated the fracture job on the well
  • Identified gas-producing intervals in a tight reservoir
  • Located water inflow intervals behind casing
  • Provided insights for future workover and stimulation

← All resources

Need a similar outcome?

Talk to TGT about diagnostics for your wells.

Contact us